Exhaust systems were required to serve 4 No Cummins C3000D5E 2400 KW generators in a large data centre in Slough.

The Outcome

4 No 450mm ID stainless steel twin wall insulated exhaust systems were installed into a steel frame before being transported to site. The frames were installed using cranes and then specialist steeplejacks completed the installation through to termination.

Have a question about this project?

Contact Us

Project Facts

Client: Cummins
Project: Design & install new generator exhaust systems for a large data centre in Slough
Services: System Design, Project Management, Installation
Duration: 1 month